Application of 5S, JIT, and TPM to reduce production times in metalworking in Lima, 2025
DOI:
https://doi.org/10.18687/LEIRD2025.1.1.951Palabras clave:
Lean Manufacturing, 5S, Just in Time (JIT), Total Productive Maintenance (TPM), Operational efficiency.Resumen
This study addresses the combined application of Lean Manufacturing techniques, specifically 5S, Just in Time, and Total Productive Maintenance, at the metalworking company INTEMAQ SAC, located in Lima, in 2025. The findings indicate that these tools achieved a significant reduction in production times, confirmed by statistical analysis. The implementation of 5S improved the organization of the production area, eliminating waste and standardizing processes, which increased productivity and reduced downtime. Furthermore, Just in Time optimized inventory management, reducing excess materials and streamlining production flow. Furthermore, TPM contributed to increasing machinery availability and performance, minimizing unexpected downtime and promoting operational continuity. The combination of these methodologies not only improved specific operational indicators but also strengthened the organizational culture based on continuous improvement, boosting the company's competitiveness in the metalworking sector. This work validates the effectiveness of Lean Manufacturing in optimizing industrial processes in similar contexts.Descargas
Publicado
2025-12-09
Número
Sección
Articles
Licencia
Derechos de autor 2025 LEIRD

Esta obra está bajo una licencia internacional Creative Commons Atribución-NoComercial 4.0.
Cómo citar
Canto Astuvilca, B. E., Flores Tineo, Y. R., Sánchez García, A., & Espinoza Cruz, M. A. (2025). Application of 5S, JIT, and TPM to reduce production times in metalworking in Lima, 2025. LACCEI, 2(13). https://doi.org/10.18687/LEIRD2025.1.1.951