Optimization of the operations of a paint production plant applying 5S, Poka Yoke 4.0 and TPM
DOI:
https://doi.org/10.18687/LACCEI2026.1.1.2061Palabras clave:
Lean Manufacturing, 5S, TPM, Poka Yoke, ProductivityResumen
Manufacturing SMEs show that unplanned production line stoppages, technical failures, and workplace disorder reduce operational reliability and limit productivity, highlighting the need to apply methodologies that stabilize operations and reduce errors. Operational variability, mechanical failures, and lack of standardization were addressed through a Lean approach integrating 5S to organize and standardize the work area, TPM to increase mean time between failures, and a sensor-based Poka Yoke system designed to prevent input shortages during the injection process. The results were validated through a hybrid model, with on-site implementation of 5S, a laboratory pilot for the digital Poka Yoke system, and an Arena simulation for TPM and the integrated model, respectively. The optimization showed an increase in productivity from 45.75 to 59.77 units per man-hour, mean time between failures increased by 24.87%, unproductive time was reduced by 70.55%, and the 5S index improved by 28%. These findings demonstrate that integrating Lean methodologies with accessible solutions constitutes a viable strategy to increase productivity, reduce variability, and enhance operational reliability in resource-constrained SMEs.Descargas
Publicado
2026-07-27
Número
Sección
Articles
Derechos de autor
Derechos de autor 2026 LACCEI
Licencia
Esta obra está bajo una Licencia Creative Commons Atribución-NoComercial-CompartirIgual 4.0 Internacional.
LACCEI conserva el copyright de todos los artículos publicados bajo los términos de su acuerdo de transferencia de copyright. Como titular del copyright, LACCEI distribuye los artículos al público bajo la Licencia Internacional Creative Commons Atribución-NoComercial-CompartirIgual 4.0 (CC BY-NC-SA 4.0).
Cómo citar
Lopez-Luna, A. A., Rejas-Rouillon, S., Chavez-Ugaz, R., & Quiroz-Flores, J. C. (2026). Optimization of the operations of a paint production plant applying 5S, Poka Yoke 4.0 and TPM. LACCEI, 1(14). https://doi.org/10.18687/LACCEI2026.1.1.2061