Optimization of Reception Dwell Time through Lean Manufacturing: A Case Study in a Logistics SME in Peru
DOI:
https://doi.org/10.18687/LACCEI2025.1.1.1032Palabras clave:
Process Standardization, Operation Efficiency, Warehouse Management, Supply Chain Improvement, Lean Tools Implementation.Resumen
The logistics industry faces significant challenges in managing product dwell time in warehouse reception areas. Delays in receiving and processing goods lead to inefficiencies and reduced productivity. Previous studies have demonstrated the benefits of Lean Manufacturing tools like 5S and Standardized Work in various sectors, but there remains a gap in their application to logistics reception areas. This research addresses these issues by proposing a model to reduce product dwell time. The main challenges include prolonged product separation, errors in pallet placement, and inaccurate data entry. These inefficiencies necessitate the urgent application of Lean tools to streamline processes and improve workflow. The study's key findings show a 50% reduction in dwell time, a significant boost in productivity, and a reduction in operational errors. These improvements validate the proposed model in real-world logistics setting. This research contributes to the literature by adapting Lean tools to logistics, with measurable results in cost reduction and increased operational efficiency, offering a foundation for further research in similar contexts.Descargas
Publicado
2025-07-27
Número
Sección
Articles
Derechos de autor
Derechos de autor 2025 LACCEI
Licencia
Esta obra está bajo una Licencia Creative Commons Atribución-NoComercial-CompartirIgual 4.0 Internacional.
LACCEI conserva el copyright de todos los artículos publicados bajo los términos de su acuerdo de transferencia de copyright. Como titular del copyright, LACCEI distribuye los artículos al público bajo la Licencia Internacional Creative Commons Atribución-NoComercial-CompartirIgual 4.0 (CC BY-NC-SA 4.0).
Cómo citar
Herrera-Abt, P. R., López-Malvaseda, M. A., & Quiroz-Flores, J. C. (2025). Optimization of Reception Dwell Time through Lean Manufacturing: A Case Study in a Logistics SME in Peru. LACCEI, 1(12). https://doi.org/10.18687/LACCEI2025.1.1.1032