Human-Centered Multi-Objective Flow Shop Scheduling with Missing Operations under an Industry 5.0 Perspective
DOI:
https://doi.org/10.18687/LACCEI2026.1.1.2693Palabras clave:
Industry 5.0, flow shop scheduling, missing operations, multi-objective optimization, human factorsResumen
Industry 5.0 is transforming production planning by integrating human factors into decision-making. This paper addresses a multi-objective permutation flow shop scheduling problem with missing operations, where jobs may skip machines and processing times depend on worker-related factors such as skill level, age, learning, and forgetting. The model simultaneously minimizes makespan, total tardiness, and total earliness. To solve the problem, an NSGA-II-based evolutionary algorithm with permutation encoding was implemented. Computational experiments with 0%, 20%, and 40% missing operations show that greater route flexibility generally improves schedule quality, reducing makespan by 4.41% to 27.71% and total earliness by 18.11% to 77.53% in compromise solutions, while tardiness shows a more heterogeneous behavior. The results also indicate that missing operations reshape the trade-off structure among objectives rather than simply reducing problem size. Overall, the study provides a human-centered scheduling approach aligned with Industry 5.0 and relevant for production environments with workforce heterogeneity and route variability.Descargas
Publicado
2026-07-27
Número
Sección
Articles
Derechos de autor
Derechos de autor 2026 LACCEI
Licencia
Esta obra está bajo una Licencia Creative Commons Atribución-NoComercial-CompartirIgual 4.0 Internacional.
LACCEI conserva el copyright de todos los artículos publicados bajo los términos de su acuerdo de transferencia de copyright. Como titular del copyright, LACCEI distribuye los artículos al público bajo la Licencia Internacional Creative Commons Atribución-NoComercial-CompartirIgual 4.0 (CC BY-NC-SA 4.0).
Cómo citar
Castellano, C., Marcenac, F., Yuraszeck, F., Rossit, D., & Rossit, D. A. (2026). Human-Centered Multi-Objective Flow Shop Scheduling with Missing Operations under an Industry 5.0 Perspective. LACCEI, 1(14). https://doi.org/10.18687/LACCEI2026.1.1.2693