Human-Centered Multi-Objective Flow Shop Scheduling with Missing Operations under an Industry 5.0 Perspective
DOI:
https://doi.org/10.18687/LACCEI2026.1.1.2693Keywords:
Industry 5.0, flow shop scheduling, missing operations, multi-objective optimization, human factorsAbstract
Industry 5.0 is transforming production planning by integrating human factors into decision-making. This paper addresses a multi-objective permutation flow shop scheduling problem with missing operations, where jobs may skip machines and processing times depend on worker-related factors such as skill level, age, learning, and forgetting. The model simultaneously minimizes makespan, total tardiness, and total earliness. To solve the problem, an NSGA-II-based evolutionary algorithm with permutation encoding was implemented. Computational experiments with 0%, 20%, and 40% missing operations show that greater route flexibility generally improves schedule quality, reducing makespan by 4.41% to 27.71% and total earliness by 18.11% to 77.53% in compromise solutions, while tardiness shows a more heterogeneous behavior. The results also indicate that missing operations reshape the trade-off structure among objectives rather than simply reducing problem size. Overall, the study provides a human-centered scheduling approach aligned with Industry 5.0 and relevant for production environments with workforce heterogeneity and route variability.Downloads
Published
2026-07-27
Issue
Section
Articles
Copyright
Copyright (c) 2026 LACCEI
License
This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.
LACCEI retains copyright of all published articles under the terms of its copyright transfer agreement. As the copyright holder, LACCEI distributes the articles to the public under the Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License (CC BY-NC-SA 4.0).
How to Cite
Castellano, C., Marcenac, F., Yuraszeck, F., Rossit, D., & Rossit, D. A. (2026). Human-Centered Multi-Objective Flow Shop Scheduling with Missing Operations under an Industry 5.0 Perspective. LACCEI, 1(14). https://doi.org/10.18687/LACCEI2026.1.1.2693