Pumping system, mining operation, underground mining, water recirculation, water treatment.Abstract
This work presents a proposal for the expansion of a water treatment system inside an underground mine, and thus optimize the water resource present in the mining operation. For this purpose, the design parameters of an existing two-stage pumping system were determined and the hydrogeological conditions of the mine were analyzed. It was determined that a 500 HP pump was necessary that can deliver a dynamic head of 75 meters. Finally, an evaluation of the economic feasibility of the expansion design towards a three-stage pumping system with sedimentary pumps was carried out for its implementation. An approximate CAPEX of the pumping system of US$ 13,571,442 was determined; and an OPEX of 0.299 US$/m3. Likewise, based on the estimated VPT of the mineral, the reserve report, the CAPEX of the pumping system and other projects, a NPV of the mine of US$ 65,562,057 and an IRR of 18.10% was estimated.Downloads
Published
2024-07-27
Issue
Section
Articles
Copyright
Copyright (c) 2024 LACCEI
License
This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.
LACCEI retains copyright of all published articles under the terms of its copyright transfer agreement. As the copyright holder, LACCEI distributes the articles to the public under the Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License (CC BY-NC-SA 4.0).
How to Cite
Sumaria Montes, G., Suarez, C., & Guzman, M. (2024). Proposal to expand the pumping system for treatment and recirculation of underground water in a mining operation. LACCEI, 1(10). https://doi.org/10.18687/LACCEI2024.1.1.215