Proposal to expand the pumping system for treatment and recirculation of underground water in a mining operation
DOI:
https://doi.org/10.18687/LACCEI2024.1.1.215Keywords:
Pumping system, mining operation, underground mining, water recirculation, water treatment.Abstract
This work presents a proposal for the expansion of a water treatment system inside an underground mine, and thus optimize the water resource present in the mining operation. For this purpose, the design parameters of an existing two-stage pumping system were determined and the hydrogeological conditions of the mine were analyzed. It was determined that a 500 HP pump was necessary that can deliver a dynamic head of 75 meters. Finally, an evaluation of the economic feasibility of the expansion design towards a three-stage pumping system with sedimentary pumps was carried out for its implementation. An approximate CAPEX of the pumping system of US$ 13,571,442 was determined; and an OPEX of 0.299 US$/m3. Likewise, based on the estimated VPT of the mineral, the reserve report, the CAPEX of the pumping system and other projects, a NPV of the mine of US$ 65,562,057 and an IRR of 18.10% was estimated.Downloads
Published
2024-04-09
Issue
Section
Articles
License
Copyright (c) 2024 LACCEI

This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.
How to Cite
Sumaria Montes, G., Suarez, C., & Guzman, M. (2024). Proposal to expand the pumping system for treatment and recirculation of underground water in a mining operation. LACCEI, 1(10). https://doi.org/10.18687/LACCEI2024.1.1.215