Design of a Preventive Maintenance Plan for Escalators of Panama Metro Line 1
DOI:
https://doi.org/10.18687/LACCEI2026.1.1.186Keywords:
maintenance, escalators, Panama Metro.Abstract
This article presents the development of a preventive maintenance plan for the escalators of the Panama Metro. It addresses the technical and functional specifications of the electromechanical escalators on Line 1 of the Panama Metro and the corresponding technical standards ISO 25745 and EN 115. A literature review of other maintenance plans for escalators on the metro line is conducted, and a proposal for a preventive maintenance plan and its scheduling for the electromechanical escalators of the Panama Metro is developed.Downloads
Published
2026-07-27
Issue
Section
Articles
Copyright
Copyright (c) 2026 LACCEI
License
This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.
LACCEI retains copyright of all published articles under the terms of its copyright transfer agreement. As the copyright holder, LACCEI distributes the articles to the public under the Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License (CC BY-NC-SA 4.0).
How to Cite
Berbey-Alvarez, A., Sanz Bobi, J. D. D., Henriquez Espinosa, F. R., Díaz, C., & Rodriguez, A. (2026). Design of a Preventive Maintenance Plan for Escalators of Panama Metro Line 1. LACCEI, 1(14). https://doi.org/10.18687/LACCEI2026.1.1.186