Risk analysis in NEC type B contracts, a case study in Peru

Authors

  • Michael Linder Yuncar Solis Universidad Nacional Mayor De San Marcos - (Pe), Perú
  • Franck Noa Ataypoma Universidad Nacional Mayor De San Marcos - (Pe), Perú
  • Fernando Jose Beltran Leon Universidad Nacional Mayor De San Marcos - (Pe), Perú
  • Adrian Felipe Tomaylla Bejarano Universidad Nacional Mayor De San Marcos - (Pe), Perú
  • Yvan Huaricallo Vilca Universidad Nacional Mayor De San Marcos - (Pe), Perú

DOI:

https://doi.org/10.18687/LACCEI2025.1.1.1927

Keywords:

Risk allocation, NEC contracts, controversies, contracts, state contracting

Abstract

The study examines risk management in traditional unit price contracts under the State Contracting Law (LCE) in public works on the northern coast of Peru, impacted by natural phenomena such as the El Niño Phenomenon, contrasting them with NEC Option B contracts. 50 contracts were evaluated through official sources such as SEACE and OSCE, in addition to conducting surveys with 30 professionals and interviews with 22 specialists. The findings indicate that the risks associated with natural phenomena, technical failures and social disputes are mainly attributed to contractors, causing disputes, excessive expenses and de-lays. On the other hand, NEC Option B contracts offer fairer risk management, versatility in scope modifications and better contractual relationships, thus reducing conflicts. The study determines that the application of NEC Option B contracts in public infrastructure projects could significantly enhance risk management in Peru. It is advisable to train experts in the industry and make changes to regulations to simplify their implementation. The implementation of this model has the potential to reduce disputes and enhance the effectiveness of projects, guaranteeing their feasibility and long-term sustainability.

Downloads

Published

2025-07-27

How to Cite

Yuncar Solis, M. L., Noa Ataypoma, F., Beltran Leon, F. J., Tomaylla Bejarano, A. F., & Huaricallo Vilca, Y. (2025). Risk analysis in NEC type B contracts, a case study in Peru. LACCEI, 1(12). https://doi.org/10.18687/LACCEI2025.1.1.1927