Improvement model to reduce internal lead time trough SLP, slotting and MRP in a metalworking plant
DOI:
https://doi.org/10.18687/LACCEI2026.1.1.996Palabras clave:
Internal Lead Time, SLP, Slotting, MRP, internal logistics, metalworkingResumen
This research was conducted in a micro-enterprise (MSME) in the metalworking sector, which, like other similar companies, faces logistical problems in its warehouse management. In this case, the Internal Lead Time (ILT) of the order preparation process was 4.74 hours, impacting the achievement of the internal customer service level and causing delays in the timely supply of materials to the production area. The diagnosis revealed unnecessary travel distances and disorganized storage of supplies as the root cause, associated with a layout that does not favor material flow, as well as frequent stockouts due to poor planning. An improvement model was proposed that integrates Systematic Planning (SLP), Slotting, and Material Requirements Planning (MRP). SLP reduces internal travel time, Slotting reduces search time on shelves, and MRP reduces stockouts. The Arena simulation, modeled with data from a pilot project, validates that the ILT was reduced by 18.6%, thus validating the effectiveness of the proposed model.Descargas
Publicado
2026-07-27
Número
Sección
Articles
Derechos de autor
Derechos de autor 2026 LACCEI
Licencia
Esta obra está bajo una Licencia Creative Commons Atribución-NoComercial-CompartirIgual 4.0 Internacional.
LACCEI conserva el copyright de todos los artículos publicados bajo los términos de su acuerdo de transferencia de copyright. Como titular del copyright, LACCEI distribuye los artículos al público bajo la Licencia Internacional Creative Commons Atribución-NoComercial-CompartirIgual 4.0 (CC BY-NC-SA 4.0).
Cómo citar
Peña Castañeda, K. A., Oscco Villar, J. B., & Cabrera Gil Grados, E. M. (2026). Improvement model to reduce internal lead time trough SLP, slotting and MRP in a metalworking plant. LACCEI, 1(14). https://doi.org/10.18687/LACCEI2026.1.1.996