Design of a Model of Good Practices for the Use of the Work Breakdown Structure in the Management of Electrical Projects for the Industrial Sector

Authors

  • García Rojas, Juan David
  • Villa Ramírez, José Luis

DOI:

https://doi.org/10.18687/LACCEI2023.1.1.547

Keywords:

Product Scope, Project Scope, ETD/WBS, Project Management, PMI.

Abstract

Project management through scope management based on the Work Breakdown Structure tool, WBS, offers the possibility of improving project management indicators, pointing directly to the achievement of value for organizations. This investigation was able to identify that overconfidence and ignorance of the fundamental tools and techniques of project management is one of the reasons that directly and negatively impacts the scope, schedule and cost of electrical projects in the industrial sector. Additionally, it delivers an agile guide and EDT type that seeks to promote the use of basic tools and at the same time improve results.

Downloads

Published

2023-07-27

Issue

Section

Articles

License

Creative Commons License

This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.

LACCEI retains copyright of all published articles under the terms of its copyright transfer agreement. As the copyright holder, LACCEI distributes the articles to the public under the Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License (CC BY-NC-SA 4.0).

How to Cite

García Rojas, Juan David, & Villa Ramírez, José Luis. (2023). Design of a Model of Good Practices for the Use of the Work Breakdown Structure in the Management of Electrical Projects for the Industrial Sector. LACCEI, 1(8). https://doi.org/10.18687/LACCEI2023.1.1.547