Eficiencia en la Construcción de Viviendas con Aplicación de la Metodología Lean Construction en Ica, 2024
DOI:
https://doi.org/10.18687/LEIRD2025.1.1.949Palabras clave:
Last Planner System, Lean Construction, planning, productivity, five-minute testResumen
This study focused on improving efficiency at all stages of the construction process, emphasizing the creation of project structures. The Lean Construction philosophy was applied to increase productivity and reduce non-value-adding activities that caused budgetary losses. Tools such as the Last Planner System, five-minute test, Gantt chart, and topographic databases were used to assign tasks and resources (materials, labor, and machinery). Additionally, intermediate planning was implemented to anticipate constraints. The objective was to demonstrate how Lean Construction can reduce non-productive activities and increase efficiency. A quantitative approach was used, with explanatory scope and a non-experimental, cross-sectional design.Descargas
Publicado
2025-12-12
Número
Sección
Articles
Licencia
Derechos de autor 2025 LEIRD

Esta obra está bajo una licencia internacional Creative Commons Atribución-NoComercial 4.0.
Cómo citar
Tamayo Linares, M. R., & Pari Choque, B. (2025). Eficiencia en la Construcción de Viviendas con Aplicación de la Metodología Lean Construction en Ica, 2024. LACCEI, 2(13). https://doi.org/10.18687/LEIRD2025.1.1.949