Evaluate the availability of equipment before and after the implementation of Total Productive Maintenance at Cantol company, 2025
DOI:
https://doi.org/10.18687/LACCEI2026.1.1.526Keywords:
Total Productive Maintenance, preventive maintenance, autonomous maintenance, employee training, availability.Abstract
The purpose of this article was to evaluate equipment availability before and after the implementation of Total Productive Maintenance (TPM) at Cantol. The identified problem was low equipment availability, caused by mechanical and electronic failures and prolonged setup times, resulting in significant operational downtime losses. Historical availability records from the pre- and post-TPM implementation phases were used for the analysis, considering the company's implemented pillars, such as preventive maintenance, autonomous maintenance, and staff training. During the pre-implementation phase, average equipment availability was 55% for the transfer machine, 55% for the pear set assembly machine, and 53% for the vibratory machine. In the post-implementation phase, these values increased to 70%, 75%, and 68%, respectively. This increase demonstrates the effectiveness of TPM by significantly contributing to the reduction of unplanned downtime and the optimization of operating time, reaffirming its viability and applicability in a peruvian metalworking company.Downloads
Published
2026-07-27
Issue
Section
Articles
Copyright
Copyright (c) 2026 LACCEI
License
This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.
LACCEI retains copyright of all published articles under the terms of its copyright transfer agreement. As the copyright holder, LACCEI distributes the articles to the public under the Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License (CC BY-NC-SA 4.0).
How to Cite
Reyna Alcantara, A. A., Jimenez Troncos, F. D. M., De La Cruz Auqui, R. M., & Chumpe Ricra, J. E. (2026). Evaluate the availability of equipment before and after the implementation of Total Productive Maintenance at Cantol company, 2025. LACCEI, 1(14). https://doi.org/10.18687/LACCEI2026.1.1.526