Implementation of Lean Manufacturing to improve the performance of the dispatch process in the dispatch area of agro-export companies
DOI:
https://doi.org/10.18687/LACCEI2023.1.1.1460Keywords:
productivity, continuous improvement, Deming cycleAbstract
In the present investigation, the main objective was to implement lean manufacturing to improve the performance of the dispatch process and as specific objectives, it was to carry out a diagnosis of the performance of the dispatch process, to elaborate a diagnosis to determine the causes that reduce the performance of the dispatch process. dispatch, implement lean manufacturing, determine the performance of the dispatch process after implementation and perform economic analysis. This research was applied with a pre-experimental design. Tools such as VSM, SMED, 5'S and synchronization with suppliers and Ishikawa and Pareto diagram were applied for the development. 1324 containers from the 2021 campaign were sampled. The implementation of SMED reduced the cycle time to 74.34 minutes, the 5'S increased compliance by 92%, VSM reduced the process to 4 stages and supplier synchronization managed to increase by 82% . Deviation in delivery time was reduced to 0.35% and on-time delivery increased to 97%. The economic analysis of the implementation is viable with an IR of 1.17.Downloads
Published
2023-07-27
Issue
Section
Articles
Copyright
Copyright (c) 2023 LACCEI
License
This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.
LACCEI retains copyright of all published articles under the terms of its copyright transfer agreement. As the copyright holder, LACCEI distributes the articles to the public under the Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License (CC BY-NC-SA 4.0).
How to Cite
ARANDA GONZALEZ, JORGE ROGER, CAMACHO GAMEZ, TEYDY ENRIQUE, SOTO ABANTO, SEGUNDO ELOY, & GARCIA ZARE, ELMIS JONATAN. (2023). Implementation of Lean Manufacturing to improve the performance of the dispatch process in the dispatch area of agro-export companies. LACCEI, 1(8). https://doi.org/10.18687/LACCEI2023.1.1.1460