AHP, Criteria comparison matrix, Warehouse, Production
Abstract
This article aims to show the impact of the implementation of engineering tools in the mitigation of problems present in the production and logistics áreas in a textile company located in the district of San Miguel (Lima-Peru) the problem being the high rate of materials refusal to suppliers generating stops due to lack of the main material causing an increase in the cost of production. Consequently, a need appears regarding the possible solutions for this problem. To meet this objective, the Criteria Comparison Matrix tool was proposed after a previous evaluation of realistic restrictions, historical data of the main and secondary suppliers was used for the design, the study was complemented with the linear regression simulation, resulting in a reduction in production costs of a total of S/ 160.00 per month. Finally, the economic viability of the implementation was evaluated, resulting in an IRR of 17%, a NPV of S/ 1,275.44, in addition to a B/C of 7.51.