Production management model based on LEAN, TPM, DDMRP, and change management tools to reduce lead times in an SME in the garment manufacturing sector

Autores/as

  • Quiroz-Flores, Juan Carlos
  • Cáceres-Mauricio, Cesar
  • Romero-Vasquez, aniel Elias

DOI:

https://doi.org/10.18687/LACCEI2023.1.1.206

Palabras clave:

Demand Driven, MRP, Change management, PDCA Cycle, 5S, Jidoka, Total Productive Maintenance.

Resumen

Currently, SMEs are unable to meet the needs of customers, presenting problems for the delivery of complete orders on time. Based on an analysis of continuous improvement tools and integration of change management within the organization, a new production management model is proposed that manages to reduce delivery times This model uses tools such as: DDMRP, 5S, JIDOKA, TPM and integrates change management with the Kotter model as a base. The proposed model was carried out in a pilot test of an SME in the textile and clothing sector, obtaining as results: an increase in Total (IF) and inventory precision of 87.77% and 95% respectively in addition to the reduction of defective products by up to 2%.

Descargas

Publicado

2024-04-16

Número

Sección

Articles