[1]
C. Castellano, F. Marcenac, F. Yuraszeck, D. Rossit, and D. A. Rossit, “Human-Centered Multi-Objective Flow Shop Scheduling with Missing Operations under an Industry 5.0 Perspective”, LACCEI, vol. 1, no. 14, July 2026, doi: 10.18687/LACCEI2026.1.1.2693.