[1]
J. De La Torre Salazar, N. Altamirano, and M. Churata, “Automation of pre-assembly BIM, Dynamo and Augmented Reality to optimize execution time of metal formwork for vertical elements in multi-family”, LACCEI, vol. 1, no. 14, July 2026, doi: 10.18687/LACCEI2026.1.1.1797.