Quiroz-Flores, Juan Carlos, Rebollar, Katherine, & Zamalloa, Anthony. (2024). Increased On-Time In-Full orders rate in a mass-consumption warehouse by applying Lean Warehouse tools: A case Study. LACCEI, 1(8). https://doi.org/10.18687/LACCEI2023.1.1.117