De La Torre Salazar, J., Altamirano, N., & Churata, M. (2026). Automation of pre-assembly BIM, Dynamo and Augmented Reality to optimize execution time of metal formwork for vertical elements in multi-family. LACCEI, 1(14). https://doi.org/10.18687/LACCEI2026.1.1.1797