Peña Castañeda, K. A., Oscco Villar, J. B., & Cabrera Gil Grados, E. M. (2026). Improvement model to reduce internal lead time trough SLP, slotting and MRP in a metalworking plant. LACCEI, 1(14). https://doi.org/10.18687/LACCEI2026.1.1.996