1.
Quiroz-Flores, Juan Carlos, Rebollar, Katherine, Zamalloa, Anthony. Increased On-Time In-Full orders rate in a mass-consumption warehouse by applying Lean Warehouse tools: A case Study. LACCEI. 2024;1(8). doi:10.18687/LACCEI2023.1.1.117