1.
Castellano C, Marcenac F, Yuraszeck F, Rossit D, Rossit DA. Human-Centered Multi-Objective Flow Shop Scheduling with Missing Operations under an Industry 5.0 Perspective. LACCEI. 2026;1(14). doi:10.18687/LACCEI2026.1.1.2693