1.
De La Torre Salazar J, Altamirano N, Churata M. Automation of pre-assembly BIM, Dynamo and Augmented Reality to optimize execution time of metal formwork for vertical elements in multi-family. LACCEI. 2026;1(14). doi:10.18687/LACCEI2026.1.1.1797