1.
Peña Castañeda KA, Oscco Villar JB, Cabrera Gil Grados EM. Improvement model to reduce internal lead time trough SLP, slotting and MRP in a metalworking plant. LACCEI. 2026;1(14). doi:10.18687/LACCEI2026.1.1.996