1.
Reyna Alcantara AA, Jimenez Troncos FDM, De La Cruz Auqui RM, Chumpe Ricra JE. Evaluate the availability of equipment before and after the implementation of Total Productive Maintenance at Cantol company, 2025. LACCEI. 2026;1(14). doi:10.18687/LACCEI2026.1.1.526