(1)
Guerra, J. D.; Palomino, G.; Macassi, I.; Alvarez, J. C.; Yildiz, O. Proposed Based on TPM, Process Standardization and Circular Economy Tools to Reduce the Waste in a Spinach Production Line. LACCEI 2025, 1 (12). https://doi.org/10.18687/LACCEI2025.1.1.1875.