(1)
Quiroz-Flores, Juan Carlos; Rebollar, Katherine; Zamalloa, Anthony. Increased On-Time In-Full Orders Rate in a Mass-Consumption Warehouse by Applying Lean Warehouse Tools: A Case Study. LACCEI 2024, 1 (8). https://doi.org/10.18687/LACCEI2023.1.1.117.