(1)
Peña Castañeda, K. A.; Oscco Villar, J. B.; Cabrera Gil Grados, E. M. Improvement Model to Reduce Internal Lead Time Trough SLP, Slotting and MRP in a Metalworking Plant. LACCEI 2026, 1 (14). https://doi.org/10.18687/LACCEI2026.1.1.996.