[1]
Lopez-Luna, A.A. et al. 2026. Optimization of the operations of a paint production plant applying 5S, Poka Yoke 4.0 and TPM. LACCEI. 1, 14 (July 2026). DOI:https://doi.org/10.18687/LACCEI2026.1.1.2061.