[1]
Peña Castañeda, K.A. et al. 2026. Improvement model to reduce internal lead time trough SLP, slotting and MRP in a metalworking plant. LACCEI. 1, 14 (July 2026). DOI:https://doi.org/10.18687/LACCEI2026.1.1.996.