[1]
Saavedra-Huayhua, E. et al. 2026. Implementation of 5S and TPM as continuous improvement strategies to increase the availability of 777F trucks in the mining sector. LACCEI. 1, 14 (July 2026). DOI:https://doi.org/10.18687/LACCEI2026.1.1.839.