[1]
Reyna Alcantara, A.A. et al. 2026. Evaluate the availability of equipment before and after the implementation of Total Productive Maintenance at Cantol company, 2025. LACCEI. 1, 14 (July 2026). DOI:https://doi.org/10.18687/LACCEI2026.1.1.526.