[1]
Marin-Muncibay, C. et al. 2023. Propose the surface flow constructed wetland in the treatment of acid drainage in the closure of a tailings deposit. LACCEI. 2, 9 (Dec. 2023). DOI:https://doi.org/10.18687/LEIRD2023.1.1.527.